Skip to content
Unplugged Designs Landscape · Fort Myers, FL

Bulk materials

DOT Base Rock

Base rock laid and leveled under a gravel surface, such as the base of an RV pad.

RV pad framed with timbers and a leveled base, in progress

What it is

DOT base rock is the base layer we lay and level before a finished gravel surface goes on top. On our RV pad job it went down first, inside a railroad-tie border, and was finished with #89 limestone gravel. Ask us for current specifications if your project calls for them.

Common uses

  • RV pads
  • The base layer under a gravel surface
  • Pads and parking areas finished with gravel on top

In plain English

DOT Base Rock, explained without the jargon

Written for anyone who has never ordered bulk material before. If your project sounds different to what you read here, tell us about it and we will talk it through.

What it looks like

Grey crushed limestone base material with a mix of sizes and plenty of fines.

How big the pieces are

Mixed, from small stone down to dust, which is what lets it lock together.

What it is like to walk or drive on

Firm and road-like once it is spread, wetted and compacted.

What it is normally used for here

The base layer under gravel drives, RV pads and parking areas, before a finish layer such as #89 goes on top.

How it handles water

Compacts tight and sheds water off the surface rather than through it, so the grade you build into it matters.

When not to use it

Not a decorative finish, not a planting soil, and dusty if it is left as the top layer.

What it gets confused with

Paver base, which does a similar job under pavers, and clean #57 stone, which drains instead of locking up.

How it changes over time

Hardens as it compacts and weathers. A finish layer over it keeps the dust down and stops the surface rutting.

Sizes are approximate. Crushed stone and shell are screened rather than cut to size, so every load holds a range of pieces and some dust.

RV pad framed with timbers and a leveled base, in progress

Planning your order

How much dot base rock do you need?

Lay out and frame the area first, then spread and level the base before the top layer goes on. Measure the length, width and planned base depth. We can help work out the base and top-layer quantities together.

As a general rule, one cubic yard covers about 100 square feet at 3 inches deep. Coverage changes with depth and material, so use the calculator for your numbers and we will confirm before delivery.

Open the Material Calculator See the related service
Before you order: a quick checklist
  • Measure the length, width and planned depth. The calculator turns them into cubic yards.
  • Consider depth. It changes the quantity more than most people expect. We can advise on depth for the job.
  • Pick the drop spot: a firm, reachable place close to where you will use the material.
  • Check access: gates, soft ground, low wires or branches and tight turns. Delivery checklist.
  • Check community rules on bulk deliveries and materials if you have an HOA.
  • Deliveries have a 3 cubic yard minimum, and the delivery fee is set by ZIP code.

Real projects

See this material in a real project

Delivery

Delivered to your driveway or job site.

We deliver to accessible driveways and job sites across Fort Myers and Southwest Florida. Let us know about gates, soft ground, low wires or HOA rules when you request a quote.

  • 3 cubic yard minimumDelivered by the yard to your driveway or job site.
  • Typically 3–5 daysNext-day is often available, depending on material and routing.
  • Fee set by ZIP codeQuoted up front, before your order is confirmed.
  • Fort Myers basedDelivering across Lee County and Southwest Florida.

Guides

Before you order

Related materials

Need DOT Base Rock delivered?

Send the address, measurements and how you will use it. We will confirm the yardage, price and delivery fee.

Call Request a Quote